“You don’t want the utility or maybe the grid operator being overpaying for power if they don’t really need to,” Davis mentioned. To qualify for these adders, assignments normally want to satisfy specific circumstances, which includes prevailing wage and apprenticeship requirements, and should start development inside of designated time frames https://californiasolarcompany.sport.blog/2023/08/16/top-things-to-remember-when-switching-to-solar-energy/