The 25mm thick heavy metal tube is pushed Along with the finish shut by a metal shoe. On reaching the essential driving resistance, a full duration cage is decreased in to your tube and full of large slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://cast-in-situ-piles-in-dha27147.fare-blog.com/32699668/new-step-by-step-map-for-cast-in-situ-piles