1

Advanced 400 kW Chiller Installation Secures £50K Annual Cost Reduction on Energy and 200 Tonnes CO₂ Cut

News Discuss 
Project Highlight At a prominent confectionery site in York, Newsome has commissioned a high-capacity 400 kW chiller, marking the timely execution of the project. Designed to reinforce ESG targets, the installation enhances cooling reliability while cutting overall power consumption and CO₂ discharge. https://worldlistpro.com/story22725291/advanced-400-kw-chiller-installation-secures-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story